Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
405 W SPEEDWAY BL
Apply Date:
04/28/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
3 water service abandonments, 2 water relocates, 2 new 1" services

Permit Reviews

Permit Number - TR-UTL-0425-00695
Permit Status: Complete
Permit Description: 3 water service abandonments, 2 water relocates, 2 new 1" services
Start Date Submittal Complete Date Status  
05/07/2025 RIGHT-OF-WAY REVIEW v.3 05/07/2025 APPROVED Review Details
05/05/2025 RIGHT-OF-WAY REVIEW v.2 05/06/2025 REQUIRES RESUBMIT Review Details
04/28/2025 RIGHT-OF-WAY REVIEW v.1 04/29/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0425-00695
Permit Status: Complete
Permit Description: 3 water service abandonments, 2 water relocates, 2 new 1" services
Total Outstanding Activity Conditions - 5
Date Name
04/29/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
04/29/2025 Traffic control set-up approved between 9AM - 3:30PM
05/07/2025 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
05/07/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
05/07/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0425-00695
Permit Description: 3 water service abandonments, 2 water relocates, 2 new 1" services
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/10/2025 TRSP - ROW - Barricade - Setup/Routine Passed
06/10/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/10/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
06/10/2025 TRSP - ROW - Final Passed