Permit: TR-UTL-0425-00695
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
405 W SPEEDWAY BL
Address NEW:
405 W SPEEDWAY BL
Apply Date:
04/28/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
3 water service abandonments, 2 water relocates, 2 new 1" services
Permit Reviews
Permit Number - TR-UTL-0425-00695
Permit Status: Complete
Permit Description: 3 water service abandonments, 2 water relocates, 2 new 1" services
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/07/2025 | RIGHT-OF-WAY REVIEW v.3 | 05/07/2025 | APPROVED |
| 05/05/2025 | RIGHT-OF-WAY REVIEW v.2 | 05/06/2025 | REQUIRES RESUBMIT |
| 04/28/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/29/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00695
Permit Status: Complete
Permit Description: 3 water service abandonments, 2 water relocates, 2 new 1" services
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/29/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/29/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/07/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 05/07/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 05/07/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00695
Permit Description: 3 water service abandonments, 2 water relocates, 2 new 1" services
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/10/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/10/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/10/2025 | TRSP - ROW - Final | Passed |