Permit: TR-UTL-0425-00680
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3074 E Old Vail Connection RD
Address NEW:
3074 E Old Vail Connection RD
Apply Date:
04/23/2025
Applicant:
Adriana Marinez
Description:
Continuation of permit number TR-UTL-0224-00263. Three (3) proposed signs giving notification of future TEP work Arizona Corporation Commission (ACC) mandated CEC Notification Sign.
Permit Reviews
Permit Number - TR-UTL-0425-00680
Permit Status: Complete
Permit Description: Continuation of permit number TR-UTL-0224-00263. Three (3) proposed signs giving notification of future TEP work Arizona Corporation Commission (ACC) mandated CEC Notification Sign.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/23/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00680
Permit Status: Complete
Permit Description: Continuation of permit number TR-UTL-0224-00263. Three (3) proposed signs giving notification of future TEP work Arizona Corporation Commission (ACC) mandated CEC Notification Sign.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 04/24/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 04/24/2025 | Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 04/25/2025 | Sight Visibility line and Triangle needs to be maintained per City of Tucson right of way code. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00680
Permit Description: Continuation of permit number TR-UTL-0224-00263. Three (3) proposed signs giving notification of future TEP work Arizona Corporation Commission (ACC) mandated CEC Notification Sign.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/26/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/26/2026 | TRSP - ROW - Final | Passed |