Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7526 E 31ST ST
Address NEW:
7526 E 31ST ST
Apply Date:
04/22/2025
Applicant:
Chelsey Bolinger
Description:
P.067193B KAHNA – OVERLASH 5,445’ OF AERIAL FIBER CABLE (Majority of Construction work already completed under previously approved permit #TR-UTL-0724-01398)

Permit Reviews

Permit Number - TR-UTL-0425-00668
Permit Status: Complete
Permit Description: P.067193B KAHNA – OVERLASH 5,445’ OF AERIAL FIBER CABLE (Majority of Construction work already completed under previously approved permit #TR-UTL-0724-01398)
Start Date Submittal Complete Date Status  
04/22/2025 RIGHT-OF-WAY REVIEW v.1 04/28/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0425-00668
Permit Status: Complete
Permit Description: P.067193B KAHNA – OVERLASH 5,445’ OF AERIAL FIBER CABLE (Majority of Construction work already completed under previously approved permit #TR-UTL-0724-01398)
Total Outstanding Activity Conditions - 3
Date Name
04/23/2025 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
04/23/2025 Traffic control set-up approved between 9AM - 3:30PM
04/23/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0425-00668
Permit Description: P.067193B KAHNA – OVERLASH 5,445’ OF AERIAL FIBER CABLE (Majority of Construction work already completed under previously approved permit #TR-UTL-0724-01398)
Total Completed Inspections - 4
Date Description Inspector Results Comments
08/08/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work already completed under previously approved permit #TR-UTL-0724-01398
08/08/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work already completed under previously approved permit #TR-UTL-0724-01398
08/08/2025 TRSP - ROW - AERIAL INSTALLATION Passed Work already completed under previously approved permit #TR-UTL-0724-01398
08/08/2025 TRSP - ROW - Final Passed Work already completed under previously approved permit #TR-UTL-0724-01398

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.067193B AERIAL MAP_V1.PDF DOCUMENTS VIEW
P.067193B_CAD_04222025_V1.PDF DOCUMENTS VIEW
P.067193B_TCP_04222025_V1.PDF DOCUMENTS VIEW