Permit: TR-UTL-0425-00667
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7650 E LERMA PL
Address NEW:
7650 E LERMA PL
Apply Date:
04/22/2025
Applicant:
Chelsey Bolinger
Description:
P.067193A KAHNA – BORE 763' & TRENCH 48’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (3) HANDHOLES & (1) PEDESTAL. OVERLASH 4,348’ OF AERIAL FIBER CABLE. (Majority of Construction work already completed under previously approved permit #TR-UTL-0724-01397)
Permit Reviews
Permit Number - TR-UTL-0425-00667
Permit Status: Complete
Permit Description: P.067193A KAHNA – BORE 763' & TRENCH 48’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (3) HANDHOLES & (1) PEDESTAL. OVERLASH 4,348’ OF AERIAL FIBER CABLE. (Majority of Construction work already completed under previously approved permit #TR-UTL-0724-01397)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/22/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/02/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00667
Permit Status: Complete
Permit Description: P.067193A KAHNA – BORE 763' & TRENCH 48’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (3) HANDHOLES & (1) PEDESTAL. OVERLASH 4,348’ OF AERIAL FIBER CABLE. (Majority of Construction work already completed under previously approved permit #TR-UTL-0724-01397)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/23/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/23/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/02/2025 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 05/02/2025 | New FSAI cabinet and handhole |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00667
Permit Description: P.067193A KAHNA – BORE 763' & TRENCH 48’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (3) HANDHOLES & (1) PEDESTAL. OVERLASH 4,348’ OF AERIAL FIBER CABLE. (Majority of Construction work already completed under previously approved permit #TR-UTL-0724-01397)
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work completed under previously approved permit #TR-UTL-0724-01397 | |
| 08/07/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work completed under previously approved permit #TR-UTL-0724-01397 | |
| 08/07/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work completed under previously approved permit #TR-UTL-0724-01397 | |
| 08/07/2025 | TRSP - ROW - Final | Passed | Work completed under previously approved permit #TR-UTL-0724-01397 |