Permit: TR-UTL-0425-00646
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
920 E 22ND ST
Address NEW:
920 E 22ND ST
Apply Date:
04/18/2025
Applicant:
Cox Communications
Description:
PRJ291623-1 Cox to trench 15', bore 385', and overlash .625 cox for 150'
Permit Reviews
Permit Number - TR-UTL-0425-00646
Permit Status: Complete
Permit Description: PRJ291623-1 Cox to trench 15', bore 385', and overlash .625 cox for 150'
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/18/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/25/2025 | REQUIRES RESUBMIT |
| 05/07/2025 | RIGHT-OF-WAY REVIEW v.2 | 05/07/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00646
Permit Status: Complete
Permit Description: PRJ291623-1 Cox to trench 15', bore 385', and overlash .625 cox for 150'
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/22/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/22/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 04/22/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 04/25/2025 | Approved and uploaded Floodplain permit will be required prior to work. Within City of Tucson Right of Way. |
| 04/25/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00646
Permit Description: PRJ291623-1 Cox to trench 15', bore 385', and overlash .625 cox for 150'
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/08/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/08/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 09/08/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 09/08/2025 | TRSP - ROW - Final | Passed |