Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
920 E 22ND ST
Address NEW:
920 E 22ND ST
Apply Date:
04/18/2025
Applicant:
Cox Communications
Description:
PRJ291623-1 Cox to trench 15', bore 385', and overlash .625 cox for 150'

Permit Reviews

Permit Number - TR-UTL-0425-00646
Permit Status: Complete
Permit Description: PRJ291623-1 Cox to trench 15', bore 385', and overlash .625 cox for 150'
Start Date Submittal Complete Date Status  
04/18/2025 RIGHT-OF-WAY REVIEW v.1 04/25/2025 REQUIRES RESUBMIT Review Details
05/07/2025 RIGHT-OF-WAY REVIEW v.2 05/07/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0425-00646
Permit Status: Complete
Permit Description: PRJ291623-1 Cox to trench 15', bore 385', and overlash .625 cox for 150'
Total Outstanding Activity Conditions - 5
Date Name
04/22/2025 Traffic control set-up approved between 9AM - 3:30PM
04/22/2025 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
04/22/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
04/25/2025 Approved and uploaded Floodplain permit will be required prior to work. Within City of Tucson Right of Way.
04/25/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0425-00646
Permit Description: PRJ291623-1 Cox to trench 15', bore 385', and overlash .625 cox for 150'
Total Completed Inspections - 5
Date Description Inspector Results Comments
08/26/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/08/2025 TRSP - ROW - Barricade - Setup/Routine Passed
09/08/2025 TRSP - ROW - Paving - Subgrade/removal/placement Passed
09/08/2025 TRSP - ROW - AERIAL INSTALLATION Passed
09/08/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
DETAILS PRJ291623-1_V1.PDF DOCUMENTS VIEW
PLANS PRJ291623-1 TUCSON_V1.PDF DOCUMENTS VIEW
TCP PRJ291623-1_V1.PDF DOCUMENTS VIEW