Permit: TR-UTL-0425-00637
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2704 E GANLEY RD
Address NEW:
2704 E GANLEY RD
Apply Date:
04/17/2025
Applicant:
David Maxey
Description:
wo2838157 2704 e ganley rd 15-14-08 se valve repair front north side of lot in dirt and asphalt 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0425-00637
Permit Status: Complete
Permit Description: wo2838157 2704 e ganley rd 15-14-08 se valve repair front north side of lot in dirt and asphalt 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/18/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/22/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00637
Permit Status: Complete
Permit Description: wo2838157 2704 e ganley rd 15-14-08 se valve repair front north side of lot in dirt and asphalt 6LF/sc
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/21/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/21/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00637
Permite Description: wo2838157 2704 e ganley rd 15-14-08 se valve repair front north side of lot in dirt and asphalt 6LF/sc
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Partial Pass | |
| 05/22/2025 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | |
| 05/22/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00637
Permit Description: wo2838157 2704 e ganley rd 15-14-08 se valve repair front north side of lot in dirt and asphalt 6LF/sc
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/28/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/28/2026 | TRSP - ROW - Final | Passed |