Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0425-00620
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
200 E CONGRESS ST
Address NEW:
200 E CONGRESS ST
Apply Date:
04/15/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing a 4" fire protection service
Permit Reviews
Permit Number - TR-UTL-0425-00620
Permit Status: Complete
Permit Description: Installing a 4" fire protection service
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/15/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/12/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00620
Permit Status: Complete
Permit Description: Installing a 4" fire protection service
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/15/2025 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 04/15/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/15/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/17/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00620
Permit Description: Installing a 4" fire protection service
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/09/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/09/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/12/2025 | TRSP - ROW - Final | Passed |