Permit: TR-UTL-0425-00612
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
2093 S MCCONNELL DR
Address NEW:
2093 S MCCONNELL DR
Apply Date:
04/12/2025
Applicant:
Description:
work order 3011776, 2093 s Mcconnell dr 14-15-20se, repair leaking service on the west side of the lot in asphalt, 6lf. ca
Permit Reviews
Permit Number - TR-UTL-0425-00612
Permit Status: Inspections
Permit Description: work order 3011776, 2093 s Mcconnell dr 14-15-20se, repair leaking service on the west side of the lot in asphalt, 6lf. ca
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/14/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/17/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00612
Permit Status: Inspections
Permit Description: work order 3011776, 2093 s Mcconnell dr 14-15-20se, repair leaking service on the west side of the lot in asphalt, 6lf. ca
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 04/17/2025 | EMERGENCY AFTER THE FACT PERMIT – A TCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Contractor to address because DTM did not have an opportunity to review, approve, or inspect the work. |
| 04/17/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 04/17/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0425-00612
Permit Description: work order 3011776, 2093 s Mcconnell dr 14-15-20se, repair leaking service on the west side of the lot in asphalt, 6lf. ca
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | Work is complete | |
| 05/12/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Pre-activity meeting was never requested | |
| 05/12/2025 | TRSP - ROW - Final | Passed | Work is complete |