Permit: TR-UTL-0425-00608
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1725 S SAN ANTONIO DR
Address NEW:
1725 S SAN ANTONIO DR
Apply Date:
04/11/2025
Applicant:
Arturo Rojo
Description:
we are installing an hcs to the property line.
Permit Reviews
Permit Number - TR-UTL-0425-00608
Permit Status: Complete
Permit Description: we are installing an hcs to the property line.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/11/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/18/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00608
Permit Status: Complete
Permit Description: we are installing an hcs to the property line.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/16/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/16/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 04/17/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 04/17/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . |
| 04/17/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00608
Permit Description: we are installing an hcs to the property line.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/28/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/20/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/28/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/29/2025 | TRSP - ROW - Final | Passed |