Permit: TR-UTL-0425-00592
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
250 S HARRISON RD
Address NEW:
250 S HARRISON RD
Apply Date:
04/08/2025
Applicant:
Cox Communications
Description:
PRJ288779-1: Cox to Overlash 559' to existing aerial, pull 229' through existing conduit and bore 104' to install CATV conduit and place vault for system tie.
Permit Reviews
Permit Number - TR-UTL-0425-00592
Permit Status: Complete
Permit Description: PRJ288779-1: Cox to Overlash 559' to existing aerial, pull 229' through existing conduit and bore 104' to install CATV conduit and place vault for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/21/2025 | RIGHT-OF-WAY REVIEW v.2 | 04/24/2025 | REQUIRES RESUBMIT |
| 04/25/2025 | RIGHT-OF-WAY REVIEW v.3 | 04/25/2025 | APPROVED |
| 04/09/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/16/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00592
Permit Status: Complete
Permit Description: PRJ288779-1: Cox to Overlash 559' to existing aerial, pull 229' through existing conduit and bore 104' to install CATV conduit and place vault for system tie.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/15/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION |
| 04/15/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00592
Permit Description: PRJ288779-1: Cox to Overlash 559' to existing aerial, pull 229' through existing conduit and bore 104' to install CATV conduit and place vault for system tie.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/19/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 07/09/2025 | TRSP - ROW - Final | Passed |