Permit: TR-UTL-0425-00585
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1177 W SILVERLAKE RD
Address NEW:
1177 W SILVERLAKE RD
Apply Date:
04/08/2025
Applicant:
Cox Communications
Description:
COX to 493' aerial overlash , 19' trench and bore 200' for system tie
Permit Reviews
Permit Number - TR-UTL-0425-00585
Permit Status: Complete
Permit Description: COX to 493' aerial overlash , 19' trench and bore 200' for system tie
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/09/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/12/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00585
Permit Status: Complete
Permit Description: COX to 493' aerial overlash , 19' trench and bore 200' for system tie
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/15/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION |
| 04/15/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/15/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/17/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. |
| 04/17/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00585
Permit Description: COX to 493' aerial overlash , 19' trench and bore 200' for system tie
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/27/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/27/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 06/03/2025 | TRSP - ROW - Final | Passed |