Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0425-00584
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3110 N SWAN RD
Address NEW:
3110 N SWAN RD
Apply Date:
04/08/2025
Applicant:
Cox Communications
Description:
PRJ290636-8-Cox to Remove & replace 1 vault location, place 1 new vault location, to include total 21ft of trench, Will pull 70ft of fiber thru existing Cox conduit, Will also bore total of 99ft & pull fiber thru.
Permit Reviews
Permit Number - TR-UTL-0425-00584
Permit Status: Complete
Permit Description: PRJ290636-8-Cox to Remove & replace 1 vault location, place 1 new vault location, to include total 21ft of trench, Will pull 70ft of fiber thru existing Cox conduit, Will also bore total of 99ft & pull fiber thru.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/09/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/18/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00584
Permit Status: Complete
Permit Description: PRJ290636-8-Cox to Remove & replace 1 vault location, place 1 new vault location, to include total 21ft of trench, Will pull 70ft of fiber thru existing Cox conduit, Will also bore total of 99ft & pull fiber thru.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/15/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/15/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00584
Permit Description: PRJ290636-8-Cox to Remove & replace 1 vault location, place 1 new vault location, to include total 21ft of trench, Will pull 70ft of fiber thru existing Cox conduit, Will also bore total of 99ft & pull fiber thru.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/03/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/03/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/24/2025 | TRSP - ROW - Final | Passed |