Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0425-00570
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
8272 E ROBB WASH TR
Address NEW:
8272 E ROBB WASH TR
Apply Date:
04/07/2025
Applicant:
National Barricade LLC.
Description:
3 5X5 BELL HOLES IN CONCRETE ON CUL DE SAC TO INCLUDE 8253, 8263, 8273, 8272, 8262 & 8252 E ROBB WASH TRL TO REPLACE GAS LINE IN MIDDLE OF STREET
Permit Reviews
Permit Number - TR-UTL-0425-00570
Permit Status: Inspections
Permit Description: 3 5X5 BELL HOLES IN CONCRETE ON CUL DE SAC TO INCLUDE 8253, 8263, 8273, 8272, 8262 & 8252 E ROBB WASH TRL TO REPLACE GAS LINE IN MIDDLE OF STREET
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/07/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/09/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00570
Permit Status: Inspections
Permit Description: 3 5X5 BELL HOLES IN CONCRETE ON CUL DE SAC TO INCLUDE 8253, 8263, 8273, 8272, 8262 & 8252 E ROBB WASH TRL TO REPLACE GAS LINE IN MIDDLE OF STREET
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/08/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/08/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0425-00570
Permit Description: 3 5X5 BELL HOLES IN CONCRETE ON CUL DE SAC TO INCLUDE 8253, 8263, 8273, 8272, 8262 & 8252 E ROBB WASH TRL TO REPLACE GAS LINE IN MIDDLE OF STREET
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/08/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/07/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 11/20/2025 | TRSP - ROW - Final | Passed |