Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
4350 E IRVINGTON RD
Apply Date:
04/04/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing a 4" Fire Protection Service & 8" Fire Hydrant for 4441 E. Irvington Rd

Permit Reviews

Permit Number - TR-UTL-0425-00561
Permit Status: Complete
Permit Description: Installing a 4" Fire Protection Service & 8" Fire Hydrant for 4441 E. Irvington Rd
Start Date Submittal Complete Date Status  
04/04/2025 RIGHT-OF-WAY REVIEW v.1 04/10/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0425-00561
Permit Status: Complete
Permit Description: Installing a 4" Fire Protection Service & 8" Fire Hydrant for 4441 E. Irvington Rd
Total Outstanding Activity Conditions - 3
Date Name
04/09/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
04/09/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
04/09/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0425-00561
Permit Description: Installing a 4" Fire Protection Service & 8" Fire Hydrant for 4441 E. Irvington Rd
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/16/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Spoke with Megan over the phone and met with Al on-site. all work to be done in the dirt shoulder north of Irvington.
05/13/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work is now complete. Therefore, a barricade set up inspection is no longer required.
05/13/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete within the right of way. Work continues onto private property.
05/13/2025 TRSP - ROW - Final Passed Work within the right of way is complete and has continued onto private property.

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
4441 E IRVINGTON RD TCP -1 SHOULDER-MODEL_V1.PDF DOCUMENTS VIEW
4441 E IRVINGTON RD DRAWING_V1.PDF DOCUMENTS VIEW