Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
04/24/2024
Applicant:
Description:
wo#2788814 2426 w silverbell tree dr 13-13-33 ne main rpr front of lot in asphalt 8LF/sc

Permit Reviews

Permit Number - TR-UTL-0424-00868
Permit Status: Complete
Permit Description: wo#2788814 2426 w silverbell tree dr 13-13-33 ne main rpr front of lot in asphalt 8LF/sc
Start Date Submittal Complete Date Status  
04/25/2024 RIGHT-OF-WAY REVIEW v.1 05/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0424-00868
Permit Status: Complete
Permit Description: wo#2788814 2426 w silverbell tree dr 13-13-33 ne main rpr front of lot in asphalt 8LF/sc
Total Outstanding Activity Conditions - 2
Date Name
04/25/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
04/25/2024 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0424-00868
Permite Description: wo#2788814 2426 w silverbell tree dr 13-13-33 ne main rpr front of lot in asphalt 8LF/sc
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/11/2024 TRSP - ROW - Final/Close-Out N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0424-00868
Permit Description: wo#2788814 2426 w silverbell tree dr 13-13-33 ne main rpr front of lot in asphalt 8LF/sc
Total Completed Inspections - 5
Date Description Inspector Results Comments
06/03/2024 TRSP - ROW - Barricade - Setup/Routine Passed
05/30/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/30/2024 TRSP - ROW - Barricade Takedown Passed
06/03/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
11/25/2024 TRSP - ROW - Final/Close-Out Passed