Permit: TR-UTL-0424-00858
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7302 E 22ND ST
Address NEW:
7302 E 22ND ST
Apply Date:
04/24/2024
Applicant:
Chelsey Bolinger
Description:
KAHNA P.067181A - BORE 111' & TRENCH 12' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) CABINET, (1) HANDHOLE & OVERLASH 4357' OF AERIAL FIBER CABLE. Updated - 8/06/2024 - Revised SOW Bore 60' & Trench 12' To Place CenturyLink Conduit & Fiber. Over lash 4436' of Aerial Fiber Cable. Permit update 8/7/2024: Renewed for 90 days.
Permit Reviews
Permit Number - TR-UTL-0424-00858
Permit Status: Complete
Permit Description: KAHNA P.067181A - BORE 111' & TRENCH 12' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) CABINET, (1) HANDHOLE & OVERLASH 4357' OF AERIAL FIBER CABLE.
Updated - 8/06/2024 - Revised SOW
Bore 60' & Trench 12' To Place CenturyLink Conduit & Fiber. Over lash 4436' of Aerial Fiber Cable.
Permit update 8/7/2024: Renewed for 90 days.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/24/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/25/2024 | APPROVED |
| 08/06/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/06/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00858
Permit Status: Complete
Permit Description: KAHNA P.067181A - BORE 111' & TRENCH 12' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) CABINET, (1) HANDHOLE & OVERLASH 4357' OF AERIAL FIBER CABLE.
Updated - 8/06/2024 - Revised SOW
Bore 60' & Trench 12' To Place CenturyLink Conduit & Fiber. Over lash 4436' of Aerial Fiber Cable.
Permit update 8/7/2024: Renewed for 90 days.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 04/24/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 04/25/2024 | ALLEY |
| 04/25/2024 | PRE-CON/PAVEMENT/SIDEWALK |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00858
Permit Description: KAHNA P.067181A - BORE 111' & TRENCH 12' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) CABINET, (1) HANDHOLE & OVERLASH 4357' OF AERIAL FIBER CABLE.
Updated - 8/06/2024 - Revised SOW
Bore 60' & Trench 12' To Place CenturyLink Conduit & Fiber. Over lash 4436' of Aerial Fiber Cable.
Permit update 8/7/2024: Renewed for 90 days.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/29/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | 3year moratorium for type 3 microsurface. notified contractor of the restoration requirements. Dan Robertson will direct on full requirements. | |
| 09/06/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed | Zac Staten - aerial installation complete | |
| 11/12/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | portion of roadway work on plans altered to aerial crossing, red lines to be submitted, no impact to asphalt | |
| 11/12/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | original plans route altered to aerial only, no impact to roadway. Backfill back of curb checked and approved | |
| 11/12/2024 | TRSP - ROW - Final/Close-Out | Passed | All previous inspections completed, site cleaned and clear of barricades. Site completed. |