Permit: TR-UTL-0424-00857
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
901 W 19TH ST
Address NEW:
901 W 19TH ST
Apply Date:
04/24/2024
Applicant:
Alexis Gonzalez
Description:
ASAP POTHOLING FOR THE EXISITING HP 8" STEEL (1982) MAIN ON 19TH ST AND VERDUGO, THE EXISTING 2" STEEL (1958) MAIN ON KROEGER LN, AND THE WATER AND SEWER LINE ALONG KROEGER LN BETWEEN 18TH AND 19TH ST. SIX POTHOLES TOTAL. PROJECT NEEDS TO BE COMPLETE BY MAY 6TH FOR CITY OF TUCSON PAVING STARTING MAY 7TH.
Permit Reviews
Permit Number - TR-UTL-0424-00857
Permit Status: Complete
Permit Description: ASAP POTHOLING FOR THE EXISITING HP 8" STEEL (1982) MAIN ON 19TH ST AND VERDUGO, THE EXISTING 2" STEEL (1958) MAIN ON KROEGER LN, AND THE WATER AND SEWER LINE ALONG KROEGER LN BETWEEN 18TH AND 19TH ST. SIX POTHOLES TOTAL. PROJECT NEEDS TO BE COMPLETE BY MAY 6TH FOR CITY OF TUCSON PAVING STARTING MAY 7TH.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/25/2024 | RIGHT-OF-WAY REVIEW v.2 | 04/26/2024 | APPROVED |
| 04/24/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/25/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00857
Permit Status: Complete
Permit Description: ASAP POTHOLING FOR THE EXISITING HP 8" STEEL (1982) MAIN ON 19TH ST AND VERDUGO, THE EXISTING 2" STEEL (1958) MAIN ON KROEGER LN, AND THE WATER AND SEWER LINE ALONG KROEGER LN BETWEEN 18TH AND 19TH ST. SIX POTHOLES TOTAL. PROJECT NEEDS TO BE COMPLETE BY MAY 6TH FOR CITY OF TUCSON PAVING STARTING MAY 7TH.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/24/2024 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |
| 04/24/2024 | PRE-CON/PAVEMENT/SIDEWALK |
| 04/24/2024 | PROP 411 |
| 04/24/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00857
Permit Description: ASAP POTHOLING FOR THE EXISITING HP 8" STEEL (1982) MAIN ON 19TH ST AND VERDUGO, THE EXISTING 2" STEEL (1958) MAIN ON KROEGER LN, AND THE WATER AND SEWER LINE ALONG KROEGER LN BETWEEN 18TH AND 19TH ST. SIX POTHOLES TOTAL. PROJECT NEEDS TO BE COMPLETE BY MAY 6TH FOR CITY OF TUCSON PAVING STARTING MAY 7TH.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 05/30/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/30/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/30/2024 | TRSP - ROW - Notice of Completion | Passed |