Permit: TR-UTL-0424-00829
Permit Details
Apply Date:
04/19/2024
Applicant:
DOONE BAKER
Description:
KAHNA P.085615A - BORE 1991' & TRENCH 106' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (14) CABINET, HANDHOLE, FLOWER POT, PEDESTALS & 2152' OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-0424-00829
Permit Status: Complete
Permit Description: KAHNA P.085615A - BORE 1991' & TRENCH 106' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (14) CABINET, HANDHOLE, FLOWER POT, PEDESTALS & 2152' OF AERIAL FIBER CABLE.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/03/2024 | RIGHT-OF-WAY REVIEW v.2 | 05/06/2024 | APPROVED |
04/19/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/29/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00829
Permit Status: Complete
Permit Description: KAHNA P.085615A - BORE 1991' & TRENCH 106' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (14) CABINET, HANDHOLE, FLOWER POT, PEDESTALS & 2152' OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
04/19/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
04/19/2024 | Traffic control set-up approved between 9AM - 3:30PM |
04/19/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00829
Permit Description: KAHNA P.085615A - BORE 1991' & TRENCH 106' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (14) CABINET, HANDHOLE, FLOWER POT, PEDESTALS & 2152' OF AERIAL FIBER CABLE.
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/16/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
08/20/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
09/09/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
09/03/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
08/27/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
09/27/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
08/28/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |