Permit: TR-UTL-0424-00820
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1925 N KOLB RD
Address NEW:
1925 N KOLB RD
Apply Date:
04/18/2024
Applicant:
Cox Communications
Description:
PRJ268860-1: Cox to Pull 124' through existing conduit, trench 2' and bore 1099' to install CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0424-00820
Permit Status: Complete
Permit Description: PRJ268860-1: Cox to Pull 124' through existing conduit, trench 2' and bore 1099' to install CATV conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/18/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/23/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00820
Permit Status: Complete
Permit Description: PRJ268860-1: Cox to Pull 124' through existing conduit, trench 2' and bore 1099' to install CATV conduit for system tie.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/18/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 04/18/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 04/18/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
| 04/18/2024 | Prop 411 project work area, Contact Nick Germanos at Nick.Germanod@tucsonaz.gov prior to start of work. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00820
Permit Description: PRJ268860-1: Cox to Pull 124' through existing conduit, trench 2' and bore 1099' to install CATV conduit for system tie.
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/20/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/31/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 05/31/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 05/31/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 06/04/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/18/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 06/25/2024 | TRSP - ROW - Final/Close-Out | Passed |