Permit: TR-UTL-0424-00809
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3402 E FORT LOWELL RD
Address NEW:
3402 E FORT LOWELL RD
Apply Date:
04/16/2024
Applicant:
Chelsey Bolinger
Description:
KAHNA P.085661B - BORE 1,082' & TRENCH 37' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) HANDHOLE (1) PEDESTAL, 968' OF AERIAL FIBER CABLE & (2) ANCHOR/DOWN GUY Updated - 6/20/2024 New Site plan to better match Traffic Control plan
Permit Reviews
Permit Number - TR-UTL-0424-00809
Permit Status: Complete
Permit Description: KAHNA P.085661B - BORE 1,082' & TRENCH 37' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) HANDHOLE (1) PEDESTAL, 968' OF AERIAL FIBER CABLE & (2) ANCHOR/DOWN GUY
Updated - 6/20/2024
New Site plan to better match Traffic Control plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/16/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/23/2024 | REQUIRES RESUBMIT |
| 06/05/2024 | RIGHT-OF-WAY REVIEW v.2 | 06/05/2024 | APPROVED |
| 06/16/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/20/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00809
Permit Status: Complete
Permit Description: KAHNA P.085661B - BORE 1,082' & TRENCH 37' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) HANDHOLE (1) PEDESTAL, 968' OF AERIAL FIBER CABLE & (2) ANCHOR/DOWN GUY
Updated - 6/20/2024
New Site plan to better match Traffic Control plan
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/16/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/05/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00809
Permit Description: KAHNA P.085661B - BORE 1,082' & TRENCH 37' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) HANDHOLE (1) PEDESTAL, 968' OF AERIAL FIBER CABLE & (2) ANCHOR/DOWN GUY
Updated - 6/20/2024
New Site plan to better match Traffic Control plan
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/03/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/03/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 12/03/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 12/03/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/03/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 12/03/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |