Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3201 E PRESIDIO RD
Apply Date:
04/16/2024
Applicant:
Chelsey Bolinger
Description:
KAHNA P.085661A - BORE 1,928' & TRENCH 199' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (12) CABINET, HANDHOLE, PEDESTAL & 2,073' OF AERIAL FIBER CABLE. PLACE (2) ANCHOR/DOWN GUY Permit update 8/9/2024: Renewed for 90 days.

Permit Reviews

Permit Number - TR-UTL-0424-00808
Permit Status: Complete
Permit Description: KAHNA P.085661A - BORE 1,928' & TRENCH 199' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (12) CABINET, HANDHOLE, PEDESTAL & 2,073' OF AERIAL FIBER CABLE. PLACE (2) ANCHOR/DOWN GUY Permit update 8/9/2024: Renewed for 90 days.
Start Date Submittal Complete Date Status  
04/16/2024 RIGHT-OF-WAY REVIEW v.1 04/24/2024 REQUIRES RESUBMIT Review Details
05/10/2024 RIGHT-OF-WAY REVIEW v.2 05/14/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0424-00808
Permit Status: Complete
Permit Description: KAHNA P.085661A - BORE 1,928' & TRENCH 199' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (12) CABINET, HANDHOLE, PEDESTAL & 2,073' OF AERIAL FIBER CABLE. PLACE (2) ANCHOR/DOWN GUY Permit update 8/9/2024: Renewed for 90 days.
Total Outstanding Activity Conditions - 3
Date Name
04/16/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
04/16/2024 Traffic control set-up approved between 9AM - 3:30PM
05/13/2024 New supporting equipment

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0424-00808
Permit Description: KAHNA P.085661A - BORE 1,928' & TRENCH 199' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (12) CABINET, HANDHOLE, PEDESTAL & 2,073' OF AERIAL FIBER CABLE. PLACE (2) ANCHOR/DOWN GUY Permit update 8/9/2024: Renewed for 90 days.
Total Completed Inspections - 6
Date Description Inspector Results Comments
08/06/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/15/2024 TRSP - ROW - Barricade - Setup/Routine Passed
11/15/2024 TRSP - ROW - Barricade Takedown Passed
11/15/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
11/15/2024 TRSP - ROW - Final/Close-Out Passed
11/15/2024 TRSP - ROW - AERIAL INSTALLATION Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.085661A - CITY OF TUCSON PLANS REV1 - 05-10-2024_V2.PDF DOCUMENTS VIEW
P.085661A - CITY OF TUCSON TCP REV1 - 05-10-2024_V2.PDF DOCUMENTS VIEW