Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0424-00803
Permit Details
Apply Date:
04/15/2024
Applicant:
Bobby Robbins
Description:
5x5 bell hole on asphalt to replace gas line. street crossing on rhiannon dr. work at 7830 & 7836 E Rhiannon Dr.
Permit Reviews
Permit Number - TR-UTL-0424-00803
Permit Status: Issued
Permit Description: 5x5 bell hole on asphalt to replace gas line. street crossing on rhiannon dr. work at 7830 & 7836 E Rhiannon Dr.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/15/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00803
Permit Status: Issued
Permit Description: 5x5 bell hole on asphalt to replace gas line. street crossing on rhiannon dr. work at 7830 & 7836 E Rhiannon Dr.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
04/16/2024 | PRE-CON/PAVEMENT/SIDEWALK |
04/16/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-UTL-0424-00803
Permite Description: 5x5 bell hole on asphalt to replace gas line. street crossing on rhiannon dr. work at 7830 & 7836 E Rhiannon Dr.
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/22/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required | |
06/24/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | no density reports given |
06/12/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required | asphalt restoration needed surface treatment required 25’ on each side of patch for entire width of roadway. marked pavement for patch. |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0424-00803
Permit Description: 5x5 bell hole on asphalt to replace gas line. street crossing on rhiannon dr. work at 7830 & 7836 E Rhiannon Dr.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/23/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
06/24/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
06/24/2024 | TRSP - ROW - Final/Close-Out | Passed |