Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Apply Date:
04/15/2024
Applicant:
Bobby Robbins
Description:
5x5 bell hole on asphalt to replace gas line. street crossing on rhiannon dr. work at 7830 & 7836 E Rhiannon Dr.

Permit Reviews

Permit Number - TR-UTL-0424-00803
Permit Status: Issued
Permit Description: 5x5 bell hole on asphalt to replace gas line. street crossing on rhiannon dr. work at 7830 & 7836 E Rhiannon Dr.
Start Date Submittal Complete Date Status  
04/15/2024 RIGHT-OF-WAY REVIEW v.1 04/16/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0424-00803
Permit Status: Issued
Permit Description: 5x5 bell hole on asphalt to replace gas line. street crossing on rhiannon dr. work at 7830 & 7836 E Rhiannon Dr.
Total Outstanding Activity Conditions - 2
Date Name
04/16/2024 PRE-CON/PAVEMENT/SIDEWALK
04/16/2024 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Issued
Permit Number: TR-UTL-0424-00803
Permite Description: 5x5 bell hole on asphalt to replace gas line. street crossing on rhiannon dr. work at 7830 & 7836 E Rhiannon Dr.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/22/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Re-inspection required
06/24/2024 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required no density reports given
06/12/2024 TRSP - ROW - Final/Close-Out N/A Re-inspection required asphalt restoration needed surface treatment required 25’ on each side of patch for entire width of roadway. marked pavement for patch.

Completed Inspections

Permit Status: Issued
Permit Number: TR-UTL-0424-00803
Permit Description: 5x5 bell hole on asphalt to replace gas line. street crossing on rhiannon dr. work at 7830 & 7836 E Rhiannon Dr.
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/23/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/24/2024 TRSP - ROW - Paving - Subgrade/removal/placement Passed
06/24/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW