Permit: TR-UTL-0424-00795
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1730 E PRINCE RD
Address NEW:
1730 E PRINCE RD
Apply Date:
04/15/2024
Applicant:
CAITLIN RIPLEY - SOUTHWEST BARRICADES
Description:
Cox to trench 8', and bore 7' continuing onto private property for commercial business service tie. Revised update 5/6/2024: Project scope updated to include aerial wreckout, and aerial drop onto private.
Permit Reviews
Permit Number - TR-UTL-0424-00795
Permit Status: Complete
Permit Description: Cox to trench 8', and bore 7' continuing onto private property for commercial business service tie.
Revised update 5/6/2024: Project scope updated to include aerial wreckout, and aerial drop onto private.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/15/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/15/2024 | APPROVED |
| 05/06/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/06/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00795
Permit Status: Complete
Permit Description: Cox to trench 8', and bore 7' continuing onto private property for commercial business service tie.
Revised update 5/6/2024: Project scope updated to include aerial wreckout, and aerial drop onto private.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/15/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/15/2024 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00795
Permit Description: Cox to trench 8', and bore 7' continuing onto private property for commercial business service tie.
Revised update 5/6/2024: Project scope updated to include aerial wreckout, and aerial drop onto private.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/05/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/05/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 08/05/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/05/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 08/05/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 08/05/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |