Permit: TR-UTL-0424-00794
Permit Details
Apply Date:
04/15/2024
Applicant:
Think Safety Inc
Description:
PRJ267305-2-Cox to Trench total 8ft & bore total 605ft, will intercept existing peds & vaults.
Permit Reviews
Permit Number - TR-UTL-0424-00794
Permit Status: Complete
Permit Description: PRJ267305-2-Cox to Trench total 8ft & bore total 605ft, will intercept existing peds & vaults.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/15/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/19/2024 | REQUIRES RESUBMIT |
04/26/2024 | RIGHT-OF-WAY REVIEW v.2 | 05/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00794
Permit Status: Complete
Permit Description: PRJ267305-2-Cox to Trench total 8ft & bore total 605ft, will intercept existing peds & vaults.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
04/15/2024 | Traffic control set-up approved between 9AM - 3:30PM |
04/15/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00794
Permite Description: PRJ267305-2-Cox to Trench total 8ft & bore total 605ft, will intercept existing peds & vaults.
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/30/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Partial Pass | |
05/30/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Partial Pass | |
05/30/2024 | TRSP - ROW - Barricade Takedown | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00794
Permit Description: PRJ267305-2-Cox to Trench total 8ft & bore total 605ft, will intercept existing peds & vaults.
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/10/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
05/17/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
05/17/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
06/10/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
06/10/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
06/10/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
06/12/2024 | TRSP - ROW - Final/Close-Out | Passed |