Permit: TR-UTL-0424-00790
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3305 E FORT LOWELL RD
Address NEW:
3305 E FORT LOWELL RD
Apply Date:
04/12/2024
Applicant:
Chelsey Bolinger
Description:
KAHNA P.085662A - BORE 3,093' & TRENCH 314' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (13) CABINET, FLOWER POT, HANDHOLES & PEDESTALS. OVERLASH 1,459' OF AERIAL FIBER CABLE. PLACE (1) ANCHOR/DOWN GUY Update 7/24/24- renewal request for 90 days
Permit Reviews
Permit Number - TR-UTL-0424-00790
Permit Status: Complete
Permit Description: KAHNA P.085662A - BORE 3,093' & TRENCH 314' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (13) CABINET, FLOWER POT, HANDHOLES & PEDESTALS. OVERLASH 1,459' OF AERIAL FIBER CABLE. PLACE (1) ANCHOR/DOWN GUY
Update 7/24/24- renewal request for 90 days
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/15/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00790
Permit Status: Complete
Permit Description: KAHNA P.085662A - BORE 3,093' & TRENCH 314' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (13) CABINET, FLOWER POT, HANDHOLES & PEDESTALS. OVERLASH 1,459' OF AERIAL FIBER CABLE. PLACE (1) ANCHOR/DOWN GUY
Update 7/24/24- renewal request for 90 days
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/15/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/15/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00790
Permit Description: KAHNA P.085662A - BORE 3,093' & TRENCH 314' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (13) CABINET, FLOWER POT, HANDHOLES & PEDESTALS. OVERLASH 1,459' OF AERIAL FIBER CABLE. PLACE (1) ANCHOR/DOWN GUY
Update 7/24/24- renewal request for 90 days
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/30/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/30/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 10/30/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 10/30/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/30/2024 | TRSP - ROW - Notice of Completion | Passed | ||
| 10/30/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |