Permit: TR-UTL-0424-00780
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3301 E FLOWER ST
Address NEW:
3301 E FLOWER ST
Apply Date:
04/12/2024
Applicant:
Chelsey Bolinger
Description:
KAHNA P.066626C - (job previously approved under the original design TR-UTL-0723-02166) - BORE 483' & TRENCH 10' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (2) PEDESTALS. OVERLASH 718' OF AERIAL FIBER CABLE. Updated - 8/16/2024 - Request for Renewal and Extension.. Request for 90 day Renewal as of 8/18/2024
Permit Reviews
Permit Number - TR-UTL-0424-00780
Permit Status: Complete
Permit Description: KAHNA P.066626C - (job previously approved under the original design TR-UTL-0723-02166) - BORE 483' & TRENCH 10' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (2) PEDESTALS. OVERLASH 718' OF AERIAL FIBER CABLE.
Updated - 8/16/2024 - Request for Renewal and Extension..
Request for 90 day Renewal as of 8/18/2024
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/12/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/19/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00780
Permit Status: Complete
Permit Description: KAHNA P.066626C - (job previously approved under the original design TR-UTL-0723-02166) - BORE 483' & TRENCH 10' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (2) PEDESTALS. OVERLASH 718' OF AERIAL FIBER CABLE.
Updated - 8/16/2024 - Request for Renewal and Extension..
Request for 90 day Renewal as of 8/18/2024
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/15/2024 | PRE-CON/PAVEMENT/SIDEWALK |
| 04/15/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00780
Permit Description: KAHNA P.066626C - (job previously approved under the original design TR-UTL-0723-02166) - BORE 483' & TRENCH 10' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (2) PEDESTALS. OVERLASH 718' OF AERIAL FIBER CABLE.
Updated - 8/16/2024 - Request for Renewal and Extension..
Request for 90 day Renewal as of 8/18/2024
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/20/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 11/20/2024 | TRSP - ROW - Notice of Completion | Passed |