Permit: TR-UTL-0424-00758
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
215 W LAGUNA ST
Address NEW:
215 W LAGUNA ST
Apply Date:
04/10/2024
Applicant:
Desert Barricades LLC
Description:
WO T110377 - TEP WORKING ON EXISTING POLE (YELLOW CIRCLE), INSTALLING 2 - 30' STEEL POLES (RED CIRCLES), AND INSTALLING WIRE IN BETWEEN POLES (RED LINES), TO ASSIST WITH A SERVICE UPGRADE AND BRING CONSTRUCTION TO STANDARDS, TEP PERFORMED BORING RESEARCH, SEE ATTACHED Request for 30 day Extension as of 6/26/2024
Permit Reviews
Permit Number - TR-UTL-0424-00758
Permit Status: Complete
Permit Description: WO T110377 - TEP WORKING ON EXISTING POLE (YELLOW CIRCLE), INSTALLING 2 - 30' STEEL POLES (RED CIRCLES), AND INSTALLING WIRE IN BETWEEN POLES (RED LINES), TO ASSIST WITH A SERVICE UPGRADE AND BRING CONSTRUCTION TO STANDARDS, TEP PERFORMED BORING RESEARCH, SEE ATTACHED
Request for 30 day Extension as of 6/26/2024
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/10/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00758
Permit Status: Complete
Permit Description: WO T110377 - TEP WORKING ON EXISTING POLE (YELLOW CIRCLE), INSTALLING 2 - 30' STEEL POLES (RED CIRCLES), AND INSTALLING WIRE IN BETWEEN POLES (RED LINES), TO ASSIST WITH A SERVICE UPGRADE AND BRING CONSTRUCTION TO STANDARDS, TEP PERFORMED BORING RESEARCH, SEE ATTACHED
Request for 30 day Extension as of 6/26/2024
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 04/11/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 04/11/2024 | Prop 411 project work area, Contact Nick Germanos at Nick.Germanod@tucsonaz.gov prior to start of work. |
| 04/15/2024 | New Utility Pole |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00758
Permit Description: WO T110377 - TEP WORKING ON EXISTING POLE (YELLOW CIRCLE), INSTALLING 2 - 30' STEEL POLES (RED CIRCLES), AND INSTALLING WIRE IN BETWEEN POLES (RED LINES), TO ASSIST WITH A SERVICE UPGRADE AND BRING CONSTRUCTION TO STANDARDS, TEP PERFORMED BORING RESEARCH, SEE ATTACHED
Request for 30 day Extension as of 6/26/2024
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/03/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/03/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 02/03/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 02/03/2025 | TRSP - ROW - Final/Close-Out | Passed |