Permit: TR-UTL-0424-00735
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1307 N ALVERNON WY
Address NEW:
1307 N ALVERNON WY
Apply Date:
04/08/2024
Applicant:
Cox Communications
Description:
COX TO BORE 36' AND TRENCH 9' AND OVERLASH 532' FOR SYSTEM TIE
Permit Reviews
Permit Number - TR-UTL-0424-00735
Permit Status: Complete
Permit Description: COX TO BORE 36' AND TRENCH 9' AND OVERLASH 532' FOR SYSTEM TIE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/08/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/15/2024 | REQUIRES RESUBMIT |
| 04/25/2024 | RIGHT-OF-WAY REVIEW v.2 | 04/25/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00735
Permit Status: Complete
Permit Description: COX TO BORE 36' AND TRENCH 9' AND OVERLASH 532' FOR SYSTEM TIE
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/09/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 04/09/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/09/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
| 05/01/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00735
Permit Description: COX TO BORE 36' AND TRENCH 9' AND OVERLASH 532' FOR SYSTEM TIE
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/31/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/31/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/31/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/31/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 07/31/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 07/31/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 07/31/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |