Description:
Updated - 5/06/2024 --- Revision in work done on the Main. The Main running line has been shifted from the North side of 36th Street to the South Side. Traffic Control and Site plans Install 1518' of 4" PE8400 along the north edge of ROW of 36th Street from existing gas main stub at 1435 E 36th Street west to Fremont Avenue. Install main along eastern ROW of Freeman Avenue from 36th Street to alley behind 1063 E 36th Street continuing west within the alley to tie into existing main at S Park Avenue.
Permit Reviews
Permit Number - TR-UTL-0424-00719
Permit Status: Complete
Permit Description: Updated - 5/06/2024 --- Revision in work done on the Main. The Main running line has been shifted from the North side of 36th Street to the South Side.
Traffic Control and Site plans Install 1518' of 4" PE8400 along the north edge of ROW of 36th Street from existing gas main stub at 1435 E 36th Street west to Fremont Avenue. Install main along eastern ROW of Freeman Avenue from 36th Street to alley behind 1063 E 36th Street continuing west within the alley to tie into existing main at S Park Avenue.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/03/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/06/2024 | APPROVED |
| 04/16/2024 | RIGHT-OF-WAY REVIEW v.2 | 04/18/2024 | APPROVED |
| 04/05/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/15/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00719
Permit Status: Complete
Permit Description: Updated - 5/06/2024 --- Revision in work done on the Main. The Main running line has been shifted from the North side of 36th Street to the South Side.
Traffic Control and Site plans Install 1518' of 4" PE8400 along the north edge of ROW of 36th Street from existing gas main stub at 1435 E 36th Street west to Fremont Avenue. Install main along eastern ROW of Freeman Avenue from 36th Street to alley behind 1063 E 36th Street continuing west within the alley to tie into existing main at S Park Avenue.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 04/05/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 04/05/2024 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 04/05/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 04/05/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/05/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/05/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00719
Permit Description: Updated - 5/06/2024 --- Revision in work done on the Main. The Main running line has been shifted from the North side of 36th Street to the South Side.
Traffic Control and Site plans Install 1518' of 4" PE8400 along the north edge of ROW of 36th Street from existing gas main stub at 1435 E 36th Street west to Fremont Avenue. Install main along eastern ROW of Freeman Avenue from 36th Street to alley behind 1063 E 36th Street continuing west within the alley to tie into existing main at S Park Avenue.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/09/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 06/27/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/09/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 06/27/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 06/27/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 06/25/2024 | TRSP - ROW - SITE INSPECTION | Passed |