Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
04/04/2024
Applicant:
DOONE BAKER
Description:
Updated 5/20/2024 Request for 30 day Extension of Permit as of 5/23/2024.. P.032974 - Access of ex HH 8266 for splicing, place (2) new HH, 1841' aerial fiber, (8) DG&A & (1) pole, remove (5) poles, dig (2) pits, trench 18' and underground 299' aerial fiber

Permit Reviews

Permit Number - TR-UTL-0424-00718
Permit Status: Complete
Permit Description: Updated 5/20/2024 Request for 30 day Extension of Permit as of 5/23/2024.. P.032974 - Access of ex HH 8266 for splicing, place (2) new HH, 1841' aerial fiber, (8) DG&A & (1) pole, remove (5) poles, dig (2) pits, trench 18' and underground 299' aerial fiber
Start Date Submittal Complete Date Status  
04/05/2024 RIGHT-OF-WAY REVIEW v.1 04/16/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0424-00718
Permit Status: Complete
Permit Description: Updated 5/20/2024 Request for 30 day Extension of Permit as of 5/23/2024.. P.032974 - Access of ex HH 8266 for splicing, place (2) new HH, 1841' aerial fiber, (8) DG&A & (1) pole, remove (5) poles, dig (2) pits, trench 18' and underground 299' aerial fiber
Total Outstanding Activity Conditions - 3
Date Name
04/05/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
04/05/2024 Traffic control set-up approved between 9AM - 3:30PM
04/16/2024 ARCHAEOLOGICAL MONITOR REQUIRED. Please obtain the services of a qualified archaeological monitor prior to any boring, trench, digging or grading at the site. Completed archaeological reports should be submitted to the city's HPO upon completion.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0424-00718
Permit Description: Updated 5/20/2024 Request for 30 day Extension of Permit as of 5/23/2024.. P.032974 - Access of ex HH 8266 for splicing, place (2) new HH, 1841' aerial fiber, (8) DG&A & (1) pole, remove (5) poles, dig (2) pits, trench 18' and underground 299' aerial fiber
Total Completed Inspections - 6
Date Description Inspector Results Comments
04/23/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/15/2024 TRSP - ROW - AERIAL INSTALLATION Passed
06/25/2024 TRSP - ROW - Barricade - Setup/Routine Passed
06/25/2024 TRSP - ROW - Barricade Takedown Passed
06/25/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
06/25/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.032974_CAD_04042024_V1.PDF DOCUMENTS VIEW
P.032974_TCP_04042024_V1.PDF DOCUMENTS VIEW