Permit: TR-UTL-0424-00707
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1695 W COCHRAN ST
Address NEW:
1695 W COCHRAN ST
Apply Date:
04/03/2024
Applicant:
Erica Goldston
Description:
Remove/Replace fire hydrant
Permit Reviews
Permit Number - TR-UTL-0424-00707
Permit Status: Complete
Permit Description: Remove/Replace fire hydrant
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/03/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/03/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00707
Permit Status: Complete
Permit Description: Remove/Replace fire hydrant
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 04/03/2024 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |
| 04/03/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/03/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00707
Permite Description: Remove/Replace fire hydrant
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2025 | TRSP - ROW - Final/Close-Out | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00707
Permit Description: Remove/Replace fire hydrant
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2025 | TRSP - ROW - Final | Passed | Work is complete |