Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6420 E 22ND ST
Address NEW:
6420 E 22ND ST
Apply Date:
04/03/2024
Applicant:
Tucson Electric Power
Description:
WO T81632. Installing riser on existing pole. TEP Contact: Martin Rodriguez @ (520) 991-5495.

Permit Reviews

Permit Number - TR-UTL-0424-00695
Permit Status: Complete
Permit Description: WO T81632. Installing riser on existing pole. TEP Contact: Martin Rodriguez @ (520) 991-5495.
Start Date Submittal Complete Date Status  
04/03/2024 RIGHT-OF-WAY REVIEW v.1 04/03/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0424-00695
Permit Status: Complete
Permit Description: WO T81632. Installing riser on existing pole. TEP Contact: Martin Rodriguez @ (520) 991-5495.
Total Outstanding Activity Conditions - 2
Date Name
04/03/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
04/03/2024 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0424-00695
Permit Description: WO T81632. Installing riser on existing pole. TEP Contact: Martin Rodriguez @ (520) 991-5495.
Total Completed Inspections - 5
Date Description Inspector Results Comments
05/14/2024 TRSP - ROW - Barricade Takedown Passed
05/14/2024 TRSP - ROW - Final/Close-Out Passed
05/14/2024 TRSP - ROW - AERIAL INSTALLATION Passed
07/24/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed site has been completed. no precon was held.
11/13/2024 TRSP - ROW - Barricade - Setup/Routine Passed site completed 5/2024