Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0424-00686
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
7960 E LAKESIDE PW
Address NEW:
7960 E LAKESIDE PW
Apply Date:
04/02/2024
Applicant:
Desert Barricades LLC
Description:
WO T108945. TEP to pull 710' of cable thru existing conduit. TEP Contact: Juan Valenzuela @ (520) 603-2169.
Permit Reviews
Permit Number - TR-UTL-0424-00686
Permit Status: Inspections
Permit Description: WO T108945. TEP to pull 710' of cable thru existing conduit. TEP Contact: Juan Valenzuela @ (520) 603-2169.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/02/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/08/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00686
Permit Status: Inspections
Permit Description: WO T108945. TEP to pull 710' of cable thru existing conduit. TEP Contact: Juan Valenzuela @ (520) 603-2169.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/03/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 04/03/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/03/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/03/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0424-00686
Permit Description: WO T108945. TEP to pull 710' of cable thru existing conduit. TEP Contact: Juan Valenzuela @ (520) 603-2169.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work is complete | |
| 05/20/2025 | TRSP - ROW - Final/Close-Out | Passed | Work is complete |