Permit: TR-UTL-0424-00674
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2366 S QUAIL HOLLOW DR
Address NEW:
2366 S QUAIL HOLLOW DR
Apply Date:
04/01/2024
Applicant:
eligio pena
Description:
5x5 bell hole in asphalt doing street crossing on quail hollow dr to replace gas line
Permit Reviews
Permit Number - TR-UTL-0424-00674
Permit Status: Complete
Permit Description: 5x5 bell hole in asphalt doing street crossing on quail hollow dr to replace gas line
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/04/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00674
Permit Status: Complete
Permit Description: 5x5 bell hole in asphalt doing street crossing on quail hollow dr to replace gas line
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/01/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/01/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00674
Permit Description: 5x5 bell hole in asphalt doing street crossing on quail hollow dr to replace gas line
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/30/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/30/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/15/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 06/04/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 08/22/2024 | TRSP - ROW - Final/Close-Out | Passed | Site completed |