Permit: TR-UTL-0423-01340
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7530 E APPLE TREE DR
Address NEW:
7530 E APPLE TREE DR
Apply Date:
04/19/2023
Applicant:
Cox Communications
Description:
PRJ248661-2 In Alley Behind 7530 E Apple Tree Dr, place 4x4' pot hole and ADD NEW 3X5 VAULT BESIDE EXISTING UPRIGHT PEDSTAL. Tie in.
Permit Reviews
Permit Number - TR-UTL-0423-01340
Permit Status: Complete
Permit Description: PRJ248661-2 In Alley Behind 7530 E Apple Tree Dr, place 4x4' pot hole and ADD NEW 3X5 VAULT BESIDE EXISTING UPRIGHT PEDSTAL. Tie in.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/20/2023 | RIGHT-OF-WAY REVIEW v.1 | 04/24/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0423-01340
Permit Status: Complete
Permit Description: PRJ248661-2 In Alley Behind 7530 E Apple Tree Dr, place 4x4' pot hole and ADD NEW 3X5 VAULT BESIDE EXISTING UPRIGHT PEDSTAL. Tie in.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/21/2023 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 04/21/2023 | This project is within a floodplain. Completion of a Floodplain Use Permit (FUP) is required PRIOR TO ISSUANCE of this permit. |
| 04/21/2023 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public improvements and existing drainage patterns must be restored and maintained.. |
| 04/21/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0423-01340
Permit Description: PRJ248661-2 In Alley Behind 7530 E Apple Tree Dr, place 4x4' pot hole and ADD NEW 3X5 VAULT BESIDE EXISTING UPRIGHT PEDSTAL. Tie in.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/27/2023 | TRSP - ROW - Recurring | Passed | ||
| 06/26/2023 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 06/28/2023 | TRSP - ROW - Final/Close-Out | Passed |