Permit: TR-UTL-0423-01258
Permit Details
Apply Date:
04/10/2023
Applicant:
DOONE BAKER
Description:
P.067127 - KAHNA Boring - 730' Trenching - 91' Aerial - 3,609' Boring and/or Trenching to place new CTL Cabinet, plus other buried sections. Along with Aerial Over-Lash and Placement.
Permit Reviews
Permit Number - TR-UTL-0423-01258
Permit Status: Complete
Permit Description: P.067127 - KAHNA
Boring - 730'
Trenching - 91'
Aerial - 3,609'
Boring and/or Trenching to place new CTL Cabinet, plus other buried sections. Along with Aerial Over-Lash and Placement.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/13/2023 | RIGHT-OF-WAY REVIEW v.1 | 04/19/2023 | REQUIRES RESUBMIT |
04/19/2023 | RIGHT-OF-WAY REVIEW v.2 | 04/20/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0423-01258
Permit Status: Complete
Permit Description: P.067127 - KAHNA
Boring - 730'
Trenching - 91'
Aerial - 3,609'
Boring and/or Trenching to place new CTL Cabinet, plus other buried sections. Along with Aerial Over-Lash and Placement.
Date | Description | Comments |
---|---|---|
04/14/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. | |
04/14/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0423-01258
Permit Description: P.067127 - KAHNA
Boring - 730'
Trenching - 91'
Aerial - 3,609'
Boring and/or Trenching to place new CTL Cabinet, plus other buried sections. Along with Aerial Over-Lash and Placement.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/23/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
10/09/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
10/09/2023 | TRSP - ROW - Recurring | Passed |