Permit: TR-UTL-0423-01254
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
917 N MILLER DR
Address NEW:
917 N MILLER DR
Apply Date:
04/10/2023
Applicant:
Tucson Electric Power
Description:
AFTER-THE-FACT: WO T65105. TEP CREW CHANGED OUT 2 POLES AS A PRIORITY.
Permit Reviews
Permit Number - TR-UTL-0423-01254
Permit Status: Complete
Permit Description: AFTER-THE-FACT: WO T65105. TEP CREW CHANGED OUT 2 POLES AS A PRIORITY.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/13/2023 | RIGHT-OF-WAY REVIEW v.1 | 04/13/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0423-01254
Permit Status: Complete
Permit Description: AFTER-THE-FACT: WO T65105. TEP CREW CHANGED OUT 2 POLES AS A PRIORITY.
| Date | Description | Comments |
|---|---|---|
| 04/13/2023 | EMERGENCY AFTER THE FACT ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL * * PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
| 04/13/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0423-01254
Permit Description: AFTER-THE-FACT: WO T65105. TEP CREW CHANGED OUT 2 POLES AS A PRIORITY.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
| 08/23/2023 | TRSP - ROW - Recurring | Passed | ||
| 08/23/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |