Permit: TR-UTL-0326-00600
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
1851 S PANTANO RD
Address NEW:
1851 S PANTANO RD
Apply Date:
03/31/2026
Applicant:
Cox Communications
Description:
PRJ313507-1: Cox to bore 751' to install new CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0326-00600
Permit Status: Fees due
Permit Description: PRJ313507-1: Cox to bore 751' to install new CATV conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/03/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00600
Permit Status: Fees due
Permit Description: PRJ313507-1: Cox to bore 751' to install new CATV conduit for system tie.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/03/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 04/03/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 04/03/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 04/03/2026 | Traffic control set-up approved between 9AM - 3:30PM |