Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address NEW:
158 W FRANKLIN ST
Apply Date:
03/31/2026
Applicant:
Gregg Diamond
Description:
Installing fiber optic conduit pull through and aerial

Permit Reviews

Permit Number - TR-UTL-0326-00598
Permit Status: Needs resubmittal
Permit Description: Installing fiber optic conduit pull through and aerial
Start Date Submittal Complete Date Status  
04/10/2026 RIGHT-OF-WAY REVIEW v.2 04/22/2026 REQUIRES RESUBMIT Review Details
03/31/2026 RIGHT-OF-WAY REVIEW v.1 N/A REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0326-00598
Permit Status: Needs resubmittal
Permit Description: Installing fiber optic conduit pull through and aerial
Total Outstanding Activity Conditions - 6
Date Name
04/06/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
04/06/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION
04/06/2026 Your project work requires that you contact City of Tucson Park Tucson Department to alert them and coordinate work as needed in freight loading zones, parking garage access, areas with parking meters and/or other permitted parking areas. Notify Park Tucson (520-791-5071) at least 24 hours before starting work for any parking restrictions that may occur within the boundaries of South 22nd, North Speedway, West Grande and East Campbell.
04/06/2026 Traffic control set-up approved between 9AM - 3:30PM
04/06/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/06/2026 FRANKLIN ST IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.