Permit: TR-UTL-0326-00598
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
158 W FRANKLIN ST
Address NEW:
158 W FRANKLIN ST
Apply Date:
03/31/2026
Applicant:
Gregg Diamond
Description:
Installing fiber optic conduit pull through and aerial
Permit Reviews
Permit Number - TR-UTL-0326-00598
Permit Status: Needs resubmittal
Permit Description: Installing fiber optic conduit pull through and aerial
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/10/2026 | RIGHT-OF-WAY REVIEW v.2 | 04/22/2026 | REQUIRES RESUBMIT |
| 03/31/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00598
Permit Status: Needs resubmittal
Permit Description: Installing fiber optic conduit pull through and aerial
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 04/06/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 04/06/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION |
| 04/06/2026 | Your project work requires that you contact City of Tucson Park Tucson Department to alert them and coordinate work as needed in freight loading zones, parking garage access, areas with parking meters and/or other permitted parking areas. Notify Park Tucson (520-791-5071) at least 24 hours before starting work for any parking restrictions that may occur within the boundaries of South 22nd, North Speedway, West Grande and East Campbell. |
| 04/06/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/06/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/06/2026 | FRANKLIN ST IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |