Permit: TR-UTL-0326-00583
Permit Details
Status:
Denied
Type:
Right-of-Way (ROW) - Utility
Address:
1850 E PRINCE RD
Address NEW:
1850 E PRINCE RD
Apply Date:
03/27/2026
Applicant:
Brittany West
Description:
Place 1130' of new strand over 8 spans and run 1130' of fiber. Place new aerial case, storage and riser. Place 1005' of new strand over 5 spans and run 1005' of fiber. Place 655' of new strand over 3 spans and run 655' of fiber. Place storage. Place 425' of new strand over 2 spans and run 425' of fiber. 06/23/2026 - **DENIED NO PRE-ACTIVITY FIELD MEETING HAS BEEN SCHEDULED***
Permit Reviews
Permit Number - TR-UTL-0326-00583
Permit Status: Denied
Permit Description: Place 1130' of new strand over 8 spans and run 1130' of fiber. Place new aerial case, storage and riser. Place 1005' of new strand over 5 spans and run 1005' of fiber. Place 655' of new strand over 3 spans and run 655' of fiber. Place storage. Place 425' of new strand over 2 spans and run 425' of fiber.
06/23/2026 - **DENIED NO PRE-ACTIVITY FIELD MEETING HAS BEEN SCHEDULED***
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/28/2026 | RIGHT-OF-WAY REVIEW v.3 | 04/29/2026 | REQUIRES RESUBMIT |
| 04/10/2026 | RIGHT-OF-WAY REVIEW v.2 | 04/13/2026 | REQUIRES RESUBMIT |
| 05/04/2026 | RIGHT-OF-WAY REVIEW v.4 | 05/06/2026 | APPROVED |
| 03/27/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/07/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00583
Permit Status: Denied
Permit Description: Place 1130' of new strand over 8 spans and run 1130' of fiber. Place new aerial case, storage and riser. Place 1005' of new strand over 5 spans and run 1005' of fiber. Place 655' of new strand over 3 spans and run 655' of fiber. Place storage. Place 425' of new strand over 2 spans and run 425' of fiber.
06/23/2026 - **DENIED NO PRE-ACTIVITY FIELD MEETING HAS BEEN SCHEDULED***
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 04/03/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 04/03/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/06/2026 | - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 05/06/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 05/06/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 05/06/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 05/06/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/06/2026 | Rolling Traffic Control Closures Law Enforcement Point Control Required at All crossing of Signalized or Major Intersections Rolling Closure to Require Cone placement for extended Static Work Pre-Warning Signing to include Road Work Ahead, w/Right Lane Closed Ahead on Truck for Stand by Flagman to be used for Side roads for Static Work locations |
| 05/06/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |