Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
03/26/2026
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
BORE 886' TO PLACE (1) 2" CONDUIT. PLACE (3) 4x4 BORE PITS. R&R 16SQFT. 05/14/26- Renew for 30 days as of 05/14/26 new expiration date 06/13/26.

Permit Reviews

Permit Number - TR-UTL-0326-00581
Permit Status: Complete
Permit Description: BORE 886' TO PLACE (1) 2" CONDUIT. PLACE (3) 4x4 BORE PITS. R&R 16SQFT. 05/14/26- Renew for 30 days as of 05/14/26 new expiration date 06/13/26.
Start Date Submittal Complete Date Status  
03/26/2026 RIGHT-OF-WAY REVIEW v.1 04/01/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0326-00581
Permit Status: Complete
Permit Description: BORE 886' TO PLACE (1) 2" CONDUIT. PLACE (3) 4x4 BORE PITS. R&R 16SQFT. 05/14/26- Renew for 30 days as of 05/14/26 new expiration date 06/13/26.
Total Outstanding Activity Conditions - 5
Date Name
03/27/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
03/27/2026 N Camino De La Tierra is subject to a pavement moratorium. A 2-inch mill and overlay, covering one-half the width of the roadway, shall be required. The required pavement restoration treatment shall be confirmed by the ROW Inspector at the preconstruction meeting.
03/27/2026 Traffic control set-up approved between 9AM - 3:30PM
04/01/2026 All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
04/01/2026 Approved for work in the City of Tucson's ROW only

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0326-00581
Permite Description: BORE 886' TO PLACE (1) 2" CONDUIT. PLACE (3) 4x4 BORE PITS. R&R 16SQFT. 05/14/26- Renew for 30 days as of 05/14/26 new expiration date 06/13/26.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/15/2026 TRSP - ROW - Final N/A Re-inspection required Still need to restore the potholes and the cores

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0326-00581
Permit Description: BORE 886' TO PLACE (1) 2" CONDUIT. PLACE (3) 4x4 BORE PITS. R&R 16SQFT. 05/14/26- Renew for 30 days as of 05/14/26 new expiration date 06/13/26.
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/22/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/13/2026 TRSP - ROW - Barricade - Setup/Routine Passed they will be renewing the permit for the Tucson side today they are just starting on the Tucson side
05/13/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
10/26/2026 TRSP - ROW - Final Passed The one core that was done in the Tucson city limits has been completed all the work ran underneath the rillito river comes out on Pima County side. All work for city of Tucson has been completed and meet suits Tucson standards.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW