Permit: TR-UTL-0326-00580
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
3563 N STONE AV
Address NEW:
3563 N STONE AV
Apply Date:
03/26/2026
Applicant:
Brittany West
Description:
Place 2110' of new strand over 10 spans. Place 2110' of 288ct fiber. Place 110' of new strand over 1 span. Place 110' of 288ct fiber. Place 705' of new strand over 4 spans. Place 705' of 288ct fiber. Place 110' of new strand over 1 span. Place 100' of 288ct fiber. Tie Point will be existing splice case on aerial joint utility pole. Place 550' of new strand over 2 span.s Place 550' of 288ct fiber. Place 1320' of new strand over 6 spans. Place 1320' of 288ct fiber.
Permit Reviews
Permit Number - TR-UTL-0326-00580
Permit Status: Inspections
Permit Description: Place 2110' of new strand over 10 spans. Place 2110' of 288ct fiber. Place 110' of new strand over 1 span. Place 110' of 288ct fiber. Place 705' of new strand over 4 spans. Place 705' of 288ct fiber. Place 110' of new strand over 1 span. Place 100' of 288ct fiber. Tie Point will be existing splice case on aerial joint utility pole. Place 550' of new strand over 2 span.s Place 550' of 288ct fiber. Place 1320' of new strand over 6 spans. Place 1320' of 288ct fiber.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/06/2026 | RIGHT-OF-WAY REVIEW v.2 | 04/07/2026 | APPROVED |
| 03/26/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/03/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00580
Permit Status: Inspections
Permit Description: Place 2110' of new strand over 10 spans. Place 2110' of 288ct fiber. Place 110' of new strand over 1 span. Place 110' of 288ct fiber. Place 705' of new strand over 4 spans. Place 705' of 288ct fiber. Place 110' of new strand over 1 span. Place 100' of 288ct fiber. Tie Point will be existing splice case on aerial joint utility pole. Place 550' of new strand over 2 span.s Place 550' of 288ct fiber. Place 1320' of new strand over 6 spans. Place 1320' of 288ct fiber.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/02/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 04/02/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/02/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/07/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0326-00580
Permite Description: Place 2110' of new strand over 10 spans. Place 2110' of 288ct fiber. Place 110' of new strand over 1 span. Place 110' of 288ct fiber. Place 705' of new strand over 4 spans. Place 705' of 288ct fiber. Place 110' of new strand over 1 span. Place 100' of 288ct fiber. Tie Point will be existing splice case on aerial joint utility pole. Place 550' of new strand over 2 span.s Place 550' of 288ct fiber. Place 1320' of new strand over 6 spans. Place 1320' of 288ct fiber.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2026 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | Permit has expired still have work to do in this area reached out to the project manager for Mastec. Still no word back failing permit. |
| 06/16/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required | Permit has expired still have work to do in this area reached out to the project manager for Mastec. Still no word back failing permit. |
| 06/16/2026 | TRSP - ROW - AERIAL INSTALLATION | N/A | Re-inspection required | Permit has expired still have work to do in this area reached out to the project manager for Mastec. Still no word back failing permit. still need to have a pre-con for this permit has expired. |
| 06/16/2026 | TRSP - ROW - Final | N/A | Re-inspection required | Permit has expired still have work to do in this area reached out to the project manager for Mastec. Still no word back failing permit. still need to have a pre-con for this one. |