Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1810 E Prince
Address NEW:
1810 E Prince
Apply Date:
03/26/2026
Applicant:
Brittany West
Description:
Place 1065' of new strand over 5 spans and run 1065' of fiber. Place new aerial case and storage. Place 100' of new strand over 1 span and run 100' of fiber. Place new aerial case. Place 250' of new strand over 2 spans and run 250' of fiber. Bore 255' of new conduit and fiber, Place new risers at poles. Place 845' of new strand over 5 spans and run 845' of fiber. Place new aerial case and storage. Place 1590' of new strand over 8 spans and run 1590' of fiber. Place new aerial case, storage and riser. Place 200' of new strand over 1 span and run 200' of fiber. Bore 105' of new of new conduit and fiber. Place new vault and underground fiber case. Bore 940' of new of new conduit and fiber. Place new vault, underground fiber case and storage.

Permit Reviews

Permit Number - TR-UTL-0326-00579
Permit Status: Inspections
Permit Description: Place 1065' of new strand over 5 spans and run 1065' of fiber. Place new aerial case and storage. Place 100' of new strand over 1 span and run 100' of fiber. Place new aerial case. Place 250' of new strand over 2 spans and run 250' of fiber. Bore 255' of new conduit and fiber, Place new risers at poles. Place 845' of new strand over 5 spans and run 845' of fiber. Place new aerial case and storage. Place 1590' of new strand over 8 spans and run 1590' of fiber. Place new aerial case, storage and riser. Place 200' of new strand over 1 span and run 200' of fiber. Bore 105' of new of new conduit and fiber. Place new vault and underground fiber case. Bore 940' of new of new conduit and fiber. Place new vault, underground fiber case and storage.
Start Date Submittal Complete Date Status  
04/02/2026 RIGHT-OF-WAY REVIEW v.2 04/10/2026 APPROVED Review Details
03/26/2026 RIGHT-OF-WAY REVIEW v.1 04/02/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0326-00579
Permit Status: Inspections
Permit Description: Place 1065' of new strand over 5 spans and run 1065' of fiber. Place new aerial case and storage. Place 100' of new strand over 1 span and run 100' of fiber. Place new aerial case. Place 250' of new strand over 2 spans and run 250' of fiber. Bore 255' of new conduit and fiber, Place new risers at poles. Place 845' of new strand over 5 spans and run 845' of fiber. Place new aerial case and storage. Place 1590' of new strand over 8 spans and run 1590' of fiber. Place new aerial case, storage and riser. Place 200' of new strand over 1 span and run 200' of fiber. Bore 105' of new of new conduit and fiber. Place new vault and underground fiber case. Bore 940' of new of new conduit and fiber. Place new vault, underground fiber case and storage.
Total Outstanding Activity Conditions - 6
Date Name
04/01/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
04/01/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
04/01/2026 Traffic control set-up approved between 9AM - 3:30PM
04/10/2026 - A designated school zone is located within or adjacent to the project limits. All work activities, lane closures, and traffic control shall be scheduled to avoid school arrival and dismissal times. The contractor shall always maintain safe and continuous pedestrian access
04/10/2026 Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices
04/10/2026 The contractor shall always maintain safe and continuous access to all adjacent businesses and homes during construction.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0326-00579
Permite Description: Place 1065' of new strand over 5 spans and run 1065' of fiber. Place new aerial case and storage. Place 100' of new strand over 1 span and run 100' of fiber. Place new aerial case. Place 250' of new strand over 2 spans and run 250' of fiber. Bore 255' of new conduit and fiber, Place new risers at poles. Place 845' of new strand over 5 spans and run 845' of fiber. Place new aerial case and storage. Place 1590' of new strand over 8 spans and run 1590' of fiber. Place new aerial case, storage and riser. Place 200' of new strand over 1 span and run 200' of fiber. Bore 105' of new of new conduit and fiber. Place new vault and underground fiber case. Bore 940' of new of new conduit and fiber. Place new vault, underground fiber case and storage.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
06/16/2026 TRSP - ROW - Barricade - Setup/Routine N/A Re-inspection required Permit has expired still have work to do in this area reached out to the project manager for Mastec. Still no word back failing permit.
06/16/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Re-inspection required Permit has expired still have work to do in this area reached out to the project manager for Mastec. Still no word back failing permit.
06/16/2026 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required Permit has expired still have work to do in this area reached out to the project manager for Mastec. Still no word back failing permit.
06/16/2026 TRSP - ROW - Final N/A Re-inspection required Permit has expired still have work to do in this area reached out to the project manager for Mastec. Still no word back failing permit.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
JB0002192231_PERMIT MAP PHASE 4_V1.PDF DOCUMENTS VIEW
PHASE 4_V1.PDF DOCUMENTS VIEW