Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6100 S 12TH AV
Address NEW:
6100 S 12TH AV
Apply Date:
03/26/2026
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Continuation of Permit #TR-UTL-0226-00246. Installing a 6" Fire Protection Service and 2" Water Service with 1.5" Meter & Box

Permit Reviews

Permit Number - TR-UTL-0326-00577
Permit Status: Complete
Permit Description: Continuation of Permit #TR-UTL-0226-00246. Installing a 6" Fire Protection Service and 2" Water Service with 1.5" Meter & Box
Start Date Submittal Complete Date Status  
03/26/2026 RIGHT-OF-WAY REVIEW v.1 04/01/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0326-00577
Permit Status: Complete
Permit Description: Continuation of Permit #TR-UTL-0226-00246. Installing a 6" Fire Protection Service and 2" Water Service with 1.5" Meter & Box
Total Outstanding Activity Conditions - 5
Date Name
03/26/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
03/26/2026 Traffic control set-up approved between 9AM - 3:30PM
04/01/2026 All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
04/01/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
04/01/2026 The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0326-00577
Permit Description: Continuation of Permit #TR-UTL-0226-00246. Installing a 6" Fire Protection Service and 2" Water Service with 1.5" Meter & Box
Total Completed Inspections - 4
Date Description Inspector Results Comments
05/04/2026 TRSP - ROW - Barricade - Setup/Routine Passed
05/04/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/04/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
05/04/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
6100 S 12TH-1-MODEL_V1.PDF DOCUMENTS VIEW
6100 S. 12TH AVE DRAWING REV1_V1.PDF DOCUMENTS VIEW