Permit: TR-UTL-0326-00575
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
455 W MCIVER PL
Address NEW:
455 W MCIVER PL
Apply Date:
03/25/2026
Applicant:
Austin Eslick
Description:
T159495 - Crews to park in the City of Tucson ROW to replace (13) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (2) pole locations. Risers to be replaced at (2) pole locations. No sidewalk impact. 2’x2’ excavations per pole and 3x3 excavations for (6) 55’ SH3 Poles. 08/19/2026 - Request for 30 Day Renewal as of 08/31/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Permit Reviews
Permit Number - TR-UTL-0326-00575
Permit Status: Complete
Permit Description: T159495 - Crews to park in the City of Tucson ROW to replace (13) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (2) pole locations. Risers to be replaced at (2) pole locations. No sidewalk impact. 2’x2’ excavations per pole and 3x3 excavations for (6) 55’ SH3 Poles.
08/19/2026 - Request for 30 Day Renewal as of 08/31/2026
Permit Renewal Notice
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/25/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/03/2026 | REQUIRES RESUBMIT |
| 04/06/2026 | RIGHT-OF-WAY REVIEW v.2 | 04/09/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00575
Permit Status: Complete
Permit Description: T159495 - Crews to park in the City of Tucson ROW to replace (13) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (2) pole locations. Risers to be replaced at (2) pole locations. No sidewalk impact. 2’x2’ excavations per pole and 3x3 excavations for (6) 55’ SH3 Poles.
08/19/2026 - Request for 30 Day Renewal as of 08/31/2026
Permit Renewal Notice
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/27/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 03/27/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0326-00575
Permit Description: T159495 - Crews to park in the City of Tucson ROW to replace (13) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (2) pole locations. Risers to be replaced at (2) pole locations. No sidewalk impact. 2’x2’ excavations per pole and 3x3 excavations for (6) 55’ SH3 Poles.
08/19/2026 - Request for 30 Day Renewal as of 08/31/2026
Permit Renewal Notice
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Potential flood plane delays for the project according to the contractor if they have the opportunity to work it, the permit is expiring. We're doing the pre-con if they want to extend it, contractor will contact me and let me know if we just need to close the permit until they get the rest of their future project lines set in place for acceptability with the flood plane | |
| 09/30/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Current has been extended. The new permit number is. Tr-UTL-0926-01488 closing old permit | |
| 09/30/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Current has been extended. The new permit number is. Tr-UTL-0926-01488 closing old permit | |
| 09/30/2026 | TRSP - ROW - Final | Passed | Current has been extended. The new permit number is. Tr-UTL-0926-01488 closing old permit |