Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5102 E 26TH ST
Address NEW:
5102 E 26TH ST
Apply Date:
03/25/2026
Applicant:
Austin Eslick
Description:
T147197 - REPLACING (19) & REMOVING (4) TEP POLES. REPLACING (6) ANCHORS OH CONDUCTORS AND OH ATTACHMENTS. POLE EXCAVATIONS 2'X2'. NO SIDEWALK IMPACT 08/14/26- Renew permit for 30 days as of 08/13/26 new expiration date is 09/12/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.

Permit Reviews

Permit Number - TR-UTL-0326-00571
Permit Status: Complete
Permit Description: T147197 - REPLACING (19) & REMOVING (4) TEP POLES. REPLACING (6) ANCHORS OH CONDUCTORS AND OH ATTACHMENTS. POLE EXCAVATIONS 2'X2'. NO SIDEWALK IMPACT 08/14/26- Renew permit for 30 days as of 08/13/26 new expiration date is 09/12/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Start Date Submittal Complete Date Status  
03/25/2026 RIGHT-OF-WAY REVIEW v.1 04/03/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0326-00571
Permit Status: Complete
Permit Description: T147197 - REPLACING (19) & REMOVING (4) TEP POLES. REPLACING (6) ANCHORS OH CONDUCTORS AND OH ATTACHMENTS. POLE EXCAVATIONS 2'X2'. NO SIDEWALK IMPACT 08/14/26- Renew permit for 30 days as of 08/13/26 new expiration date is 09/12/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 5
Date Name
04/01/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
04/01/2026 Traffic Control set-up approved between 7AM - 5PM
04/01/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/03/2026 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.
04/03/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0326-00571
Permit Description: T147197 - REPLACING (19) & REMOVING (4) TEP POLES. REPLACING (6) ANCHORS OH CONDUCTORS AND OH ATTACHMENTS. POLE EXCAVATIONS 2'X2'. NO SIDEWALK IMPACT 08/14/26- Renew permit for 30 days as of 08/13/26 new expiration date is 09/12/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 5
Date Description Inspector Results Comments
09/23/2026 TRSP - ROW - Barricade - Setup/Routine Passed job completed, alleyways open and devices removed from site
09/23/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed no pre con meeting held, phone call with Cody with TEP confirmed job has been completed
09/23/2026 TRSP - ROW - Backfill - Placement/Compaction Passed new poles in landscape alleyway areas installed and fully backfilled
09/23/2026 TRSP - ROW - AERIAL INSTALLATION Passed new poles in place, attachments and lines transferred
09/23/2026 TRSP - ROW - Final Passed all poles completed with transfers, alleyways open and devices removed, approved

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
DB 72243 - OVERVIEW - 5102 E 26TH ST - VARIOUS - T147197_V1.PDF DOCUMENTS VIEW
DB 72243 - PAGE 1 - 5102 E 26TH ST - VARIOUS - T147197_V1.PDF DOCUMENTS VIEW