Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1303 E BROADWAY BL
Apply Date:
03/24/2026
Applicant:
Cox Communications
Description:
PRJ312692-1: Cox to bore 4' to install new CATV fiber for system tie.

Permit Reviews

Permit Number - TR-UTL-0326-00568
Permit Status: Complete
Permit Description: PRJ312692-1: Cox to bore 4' to install new CATV fiber for system tie.
Start Date Submittal Complete Date Status  
03/24/2026 RIGHT-OF-WAY REVIEW v.1 04/01/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0326-00568
Permit Status: Complete
Permit Description: PRJ312692-1: Cox to bore 4' to install new CATV fiber for system tie.
Total Outstanding Activity Conditions - 2
Date Name
03/27/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
03/27/2026 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0326-00568
Permit Description: PRJ312692-1: Cox to bore 4' to install new CATV fiber for system tie.
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/21/2026 TRSP - ROW - Barricade - Setup/Routine Passed
07/21/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/21/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
07/21/2026 TRSP - ROW - Final Passed