Permit: TR-UTL-0326-00562
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4095 N HIGHWAY DR
Address NEW:
4095 N HIGHWAY DR
Apply Date:
03/23/2026
Applicant:
John Mussulman
Description:
wo#3173485 4095 n highway dr 13 13 21 se replace hydrant east side of the lot in dirt and road 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0326-00562
Permit Status: Complete
Permit Description: wo#3173485 4095 n highway dr 13 13 21 se replace hydrant east side of the lot in dirt and road 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/24/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/15/2026 | APPROVED |
Conditions
Permit Number - TR-UTL-0326-00562
Permit Status: Complete
Permit Description: wo#3173485 4095 n highway dr 13 13 21 se replace hydrant east side of the lot in dirt and road 6LF/sc
| Date | Description | Comments |
|---|---|---|
| 03/26/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. | |
| 04/02/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety | |
| 04/16/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. | |
| 04/02/2026 | The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period | |
| 03/26/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0326-00562
Permit Description: wo#3173485 4095 n highway dr 13 13 21 se replace hydrant east side of the lot in dirt and road 6LF/sc
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Tucson water work at a fire hydrant | |
| 06/16/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Tucson city fire hydrant work | |
| 06/16/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/14/2026 | TRSP - ROW - Final | Passed | Tucson water old permit work complete closing permit |