Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
4095 N HIGHWAY DR
Apply Date:
03/23/2026
Applicant:
John Mussulman
Description:
wo#3173485 4095 n highway dr 13 13 21 se replace hydrant east side of the lot in dirt and road 6LF/sc

Permit Reviews

Permit Number - TR-UTL-0326-00562
Permit Status: Complete
Permit Description: wo#3173485 4095 n highway dr 13 13 21 se replace hydrant east side of the lot in dirt and road 6LF/sc
Start Date Submittal Complete Date Status  
03/24/2026 RIGHT-OF-WAY REVIEW v.1 04/15/2026 APPROVED Review Details

Conditions

Permit Number - TR-UTL-0326-00562
Permit Status: Complete
Permit Description: wo#3173485 4095 n highway dr 13 13 21 se replace hydrant east side of the lot in dirt and road 6LF/sc
Date Description Comments
03/26/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
04/02/2026 All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
04/16/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
04/02/2026 The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period
03/26/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0326-00562
Permit Description: wo#3173485 4095 n highway dr 13 13 21 se replace hydrant east side of the lot in dirt and road 6LF/sc
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/16/2026 TRSP - ROW - Barricade - Setup/Routine Passed Tucson water work at a fire hydrant
06/16/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Tucson city fire hydrant work
06/16/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
07/14/2026 TRSP - ROW - Final Passed Tucson water old permit work complete closing permit

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
4095 N HIGHWAY DR_C SKETCH_V1.PDF DOCUMENTS VIEW