Permit: TR-UTL-0326-00554
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1601 E MITCHELL ST
Address NEW:
1601 E MITCHELL ST
Apply Date:
03/20/2026
Applicant:
ANGEL MORALES
Description:
wo3257936 1601 e mitchell st 13 14 31 se main repair in the middle of the intersection of mitchell and cherry asphalt 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0326-00554
Permit Status: Complete
Permit Description: wo3257936 1601 e mitchell st 13 14 31 se main repair in the middle of the intersection of mitchell and cherry asphalt 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/20/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/31/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00554
Permit Status: Complete
Permit Description: wo3257936 1601 e mitchell st 13 14 31 se main repair in the middle of the intersection of mitchell and cherry asphalt 6LF/sc
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 03/25/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 03/31/2026 | - Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |
| 03/31/2026 | A designated school zone is located within or adjacent to the project limits. All work activities, lane closures, and traffic control shall be scheduled to avoid school arrival and dismissal times. The contractor shall always maintain safe and continuous pedestrian access. |
| 03/31/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 03/31/2026 | Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices. |
| 03/31/2026 | The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0326-00554
Permit Description: wo3257936 1601 e mitchell st 13 14 31 se main repair in the middle of the intersection of mitchell and cherry asphalt 6LF/sc
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/27/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | no preactivity had but work has been completed | |
| 05/27/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Permanent patch in place all work completed | |
| 05/27/2026 | TRSP - ROW - Final | Passed | Permanent patch in place all work completed |